I have a hard time envisioning a final result to a room when there is no floor, walls, or fixtures. Lucky for me, Ryan seems to know what's up. This weekend we pulled up the floor in the kitchen and bathroom area so that we can install plumbing much more easily. If we didn't remove the flooring (which wasn't installed well to begin with) we would have had to do all plumbing work in the 1/2 crawl space.
The previous owners swept a lot of garbage into the crawl space so they wouldn't have to deal with it. Instead of crawling through garbage, we removed the flooring a cleaned up a bit. We made all of the measurements for the plumbing and should be ready to go next weekend. Then we can move forward with building bathroom walls and installing fixtures.
This weekend we also sealed the bedroom and dining room floors in order to seal in odors and start a clean slate. Our electrician should be coming some time in the next two weeks to get us on the grid. Progress, slowly but surely.